Works on the Giurgiu–Ruse Bridge: alternative traffic and longer waiting times than on May 1st
Apr 30, 2026
Works on the Giurgiu–Ruse Bridge: alternative traffic and longer waiting times than on May 1st.
Repair works continue on the Bulgarian side of the Giurgiu-Ruse Friendship Bridge, and road traffic is being carried out alternatively, on a (…)
[Read the article in Mediafax]